I. CHAIRPERSON TO CALL MEETING TO ORDER II. CHAIRPERSON TO CALL ROLL III. CITIZEN COMMENT
Receive public testimony, initiate an additional 10 day public review and comment period and approve Resolution No. MPO 2017-08 adopting the following proposed amendment(s) of the 2015-2040 Metropolitan Transportation Plan (MTP), conditional to receipt of no significant comment: Amending Table 12-10, entitled Roadway and Bicycle/Pedestrian Project Summary, Figure 12-1, entitled Roadway and Bicycle/Pedestrian Projects, Table 12-11, entitled Roadway Projects, Figure 13-1, entitled Natural Resources and Federally Funded Projects, Figure 13-2, entitled Cultural Resources and Federally Funded Projects, Figure 13-3, entitled Low Income Areas and Federally Funded Projects, Table 13-1, entitled Federally Funded Projects Environmental Assessment Results, Table 13-3, entitled Federally Funded Projects and Environmental Justice Populations; and, Figure 13-4 entitled Colonias and Federally Funded Projects as necessary to incorporate the following revisions: a) Adding project CSJ 0086-14-076 for the construction of the Shiloh Road Overpass on US 59, with an estimated construction cost is $18,539,712. Estimated letting date FY 2023. b) Adding project CSJ 0086-14-079 for the construction of the University Overpass on U.S. 59, with an estimated project construction cost of $14,648,370. Estimated letting date is FY 2022. c) Adding of project CSJ 0086-14-075 for the construction of the Del Mar Overpass on U.S. 59, with an estimated construction cost of $20,496,476. Estimated letting date is FY 2021. d) Adding Vallecillo Road project, identified as project X-10, intended to develop schematic and environmental for a 5 lane roadway, from FM 1472 to IH35. Engineering by RMA's general engineering consultant is $300,000 and is in progress. e) Revising project CSJ 0086-14-077 for the construction of the Airport Overpass on US 59 at the International Airport, with an estimated project construction cost of $14,785,990, by changing estimated letting date from fiscal year (FY) 2018 to FY 2024. f) Revising project CSJ 0086-14-078 for the construction of the Jacaman Road Overpass on US 59, with an estimated project construction cost of $19,691,424, by changing letting date from fiscal year(FY) 2020 to FY 2021. g) Revising project #4/CSJ 0086-14-058/CSJ 0086-14-072 for the upgrade to interstate standards, including overpasses at Shiloh, University and Del Mar by removing identifier CSJ 0086-14-058, revising scope to remove the three overpasses and revising funding accordingly. The overpass projects at Shiloh, University and Del Mar will be identified independently as indicated above. Project CSJ 0086-14-058 for the preliminary schematic, environmental, ROW surveying/mapping and PS&E for Loop 20 from east of International Blvd. to US 59/Loop 20 is listed independently and has already let.
Item IV C1 & Item IV B1 (Part 2 of 2)
C. Discussion with possible action to include High Occupancy Vehicles (HOV) lanes for FM 1472 (Mines Road). 1. Report by TxDOT on steps necessary to convert FM 1472 to a freeway. B. Receive public testimony, initiate an additional 10 day public review and comment period and approve Resolution No. MPO 2017-08 adopting the following proposed amendment(s) of the 2015-2040 Metropolitan Transportation Plan (MTP), conditional to receipt of no significant comment: 1. Amending Table 12-10, entitled Roadway and Bicycle/Pedestrian Project Summary, Figure 12-1, entitled Roadway and Bicycle/Pedestrian Projects, Table 12-11, entitled Roadway Projects, Figure 13-1, entitled Natural Resources and Federally Funded Projects, Figure 13-2, entitled Cultural Resources and Federally Funded Projects, Figure 13-3, entitled Low Income Areas and Federally Funded Projects, Table 13-1, entitled Federally Funded Projects Environmental Assessment Results, Table 13-3, entitled Federally Funded Projects and Environmental Justice Populations; and, Figure 13-4 entitled Colonias and Federally Funded Projects as necessary to incorporate the following revisions: a) Adding project CSJ 0086-14-076 for the construction of the Shiloh Road Overpass on US 59, with an estimated construction cost is $18,539,712. Estimated letting date FY 2023. b) Adding project CSJ 0086-14-079 for the construction of the University Overpass on U.S. 59, with an estimated project construction cost of $14,648,370. Estimated letting date is FY 2022. c) Adding of project CSJ 0086-14-075 for the construction of the Del Mar Overpass on U.S. 59, with an estimated construction cost of $20,496,476. Estimated letting date is FY 2021. d) Adding Vallecillo Road project, identified as project X-10, intended to develop schematic and environmental for a 5 lane roadway, from FM 1472 to IH35. Engineering by RMA's general engineering consultant is $300,000 and is in progress. e) Revising project CSJ 0086-14-077 for the construction of the Airport Overpass on US 59 at the International Airport, with an estimated project construction cost of $14,785,990, by changing estimated letting date from fiscal year (FY) 2018 to FY 2024. f) Revising project CSJ 0086-14-078 for the construction of the Jacaman Road Overpass on US 59, with an estimated project construction cost of $19,691,424, by changing letting date from fiscal year(FY) 2020 to FY 2021. g) Revising project #4/CSJ 0086-14-058/CSJ 0086-14-072 for the upgrade to interstate standards, including overpasses at Shiloh, University and Del Mar by removing identifier CSJ 0086-14-058, revising scope to remove the three overpasses and revising funding accordingly. The overpass projects at Shiloh, University and Del Mar will be identified independently as indicated above. Project CSJ 0086-14-058 for the preliminary schematic, environmental, ROW surveying/mapping and PS&E for Loop 20 from east of International Blvd. to US 59/Loop 20 is listed independently and has already let.
Discussion with possible action to restripe and/or add Right-of-Way for a bicycle lane onFM 1472 (Mines Road). Report by TxDOT on the projected timeframe for conducting surveying efforts associated with the proposed bike lane and presentation of draft survey instrument.
Status report by City of Laredo, Traffic Safety Department on the signal light synchronization on Mines Road.
I. ITEMS REQUIRING POLICY COMMITTEE ACTION A. Discussion with possible action on available road projects to submit under Tiger grants, including but not limited to Delmar - Loop 20 overpass. II. ADJOURNMENT
I. CHAIRPERSON TO CALL MEETING TO ORDER II. CHAIRPERSON TO CALL ROLL III. CITIZEN COMMENT
Receive public testimony, initiate an additional 10 day public review and comment period and approve Resolution No. MPO 2017-08 adopting the following proposed amendment(s) of the 2015-2040 Metropolitan Transportation Plan (MTP), conditional to receipt of no significant comment: Amending Table 12-10, entitled Roadway and Bicycle/Pedestrian Project Summary, Figure 12-1, entitled Roadway and Bicycle/Pedestrian Projects, Table 12-11, entitled Roadway Projects, Figure 13-1, entitled Natural Resources and Federally Funded Projects, Figure 13-2, entitled Cultural Resources and Federally Funded Projects, Figure 13-3, entitled Low Income Areas and Federally Funded Projects, Table 13-1, entitled Federally Funded Projects Environmental Assessment Results, Table 13-3, entitled Federally Funded Projects and Environmental Justice Populations; and, Figure 13-4 entitled Colonias and Federally Funded Projects as necessary to incorporate the following revisions: a) Adding project CSJ 0086-14-076 for the construction of the Shiloh Road Overpass on US 59, with an estimated construction cost is $18,539,712. Estimated letting date FY 2023. b) Adding project CSJ 0086-14-079 for the construction of the University Overpass on U.S. 59, with an estimated project construction cost of $14,648,370. Estimated letting date is FY 2022. c) Adding of project CSJ 0086-14-075 for the construction of the Del Mar Overpass on U.S. 59, with an estimated construction cost of $20,496,476. Estimated letting date is FY 2021. d) Adding Vallecillo Road project, identified as project X-10, intended to develop schematic and environmental for a 5 lane roadway, from FM 1472 to IH35. Engineering by RMA's general engineering consultant is $300,000 and is in progress. e) Revising project CSJ 0086-14-077 for the construction of the Airport Overpass on US 59 at the International Airport, with an estimated project construction cost of $14,785,990, by changing estimated letting date from fiscal year (FY) 2018 to FY 2024. f) Revising project CSJ 0086-14-078 for the construction of the Jacaman Road Overpass on US 59, with an estimated project construction cost of $19,691,424, by changing letting date from fiscal year(FY) 2020 to FY 2021. g) Revising project #4/CSJ 0086-14-058/CSJ 0086-14-072 for the upgrade to interstate standards, including overpasses at Shiloh, University and Del Mar by removing identifier CSJ 0086-14-058, revising scope to remove the three overpasses and revising funding accordingly. The overpass projects at Shiloh, University and Del Mar will be identified independently as indicated above. Project CSJ 0086-14-058 for the preliminary schematic, environmental, ROW surveying/mapping and PS&E for Loop 20 from east of International Blvd. to US 59/Loop 20 is listed independently and has already let.
Item IV C1 & Item IV B1 (Part 2 of 2)
C. Discussion with possible action to include High Occupancy Vehicles (HOV) lanes for FM 1472 (Mines Road). 1. Report by TxDOT on steps necessary to convert FM 1472 to a freeway. B. Receive public testimony, initiate an additional 10 day public review and comment period and approve Resolution No. MPO 2017-08 adopting the following proposed amendment(s) of the 2015-2040 Metropolitan Transportation Plan (MTP), conditional to receipt of no significant comment: 1. Amending Table 12-10, entitled Roadway and Bicycle/Pedestrian Project Summary, Figure 12-1, entitled Roadway and Bicycle/Pedestrian Projects, Table 12-11, entitled Roadway Projects, Figure 13-1, entitled Natural Resources and Federally Funded Projects, Figure 13-2, entitled Cultural Resources and Federally Funded Projects, Figure 13-3, entitled Low Income Areas and Federally Funded Projects, Table 13-1, entitled Federally Funded Projects Environmental Assessment Results, Table 13-3, entitled Federally Funded Projects and Environmental Justice Populations; and, Figure 13-4 entitled Colonias and Federally Funded Projects as necessary to incorporate the following revisions: a) Adding project CSJ 0086-14-076 for the construction of the Shiloh Road Overpass on US 59, with an estimated construction cost is $18,539,712. Estimated letting date FY 2023. b) Adding project CSJ 0086-14-079 for the construction of the University Overpass on U.S. 59, with an estimated project construction cost of $14,648,370. Estimated letting date is FY 2022. c) Adding of project CSJ 0086-14-075 for the construction of the Del Mar Overpass on U.S. 59, with an estimated construction cost of $20,496,476. Estimated letting date is FY 2021. d) Adding Vallecillo Road project, identified as project X-10, intended to develop schematic and environmental for a 5 lane roadway, from FM 1472 to IH35. Engineering by RMA's general engineering consultant is $300,000 and is in progress. e) Revising project CSJ 0086-14-077 for the construction of the Airport Overpass on US 59 at the International Airport, with an estimated project construction cost of $14,785,990, by changing estimated letting date from fiscal year (FY) 2018 to FY 2024. f) Revising project CSJ 0086-14-078 for the construction of the Jacaman Road Overpass on US 59, with an estimated project construction cost of $19,691,424, by changing letting date from fiscal year(FY) 2020 to FY 2021. g) Revising project #4/CSJ 0086-14-058/CSJ 0086-14-072 for the upgrade to interstate standards, including overpasses at Shiloh, University and Del Mar by removing identifier CSJ 0086-14-058, revising scope to remove the three overpasses and revising funding accordingly. The overpass projects at Shiloh, University and Del Mar will be identified independently as indicated above. Project CSJ 0086-14-058 for the preliminary schematic, environmental, ROW surveying/mapping and PS&E for Loop 20 from east of International Blvd. to US 59/Loop 20 is listed independently and has already let.
Discussion with possible action to restripe and/or add Right-of-Way for a bicycle lane onFM 1472 (Mines Road). Report by TxDOT on the projected timeframe for conducting surveying efforts associated with the proposed bike lane and presentation of draft survey instrument.
Status report by City of Laredo, Traffic Safety Department on the signal light synchronization on Mines Road.
I. ITEMS REQUIRING POLICY COMMITTEE ACTION A. Discussion with possible action on available road projects to submit under Tiger grants, including but not limited to Delmar - Loop 20 overpass. II. ADJOURNMENT