I. CHAIRPERSON TO CALL MEETING TO ORDER II. CHAIRPERSON TO CALL ROLL III. CITIZEN COMMENTS Speakers are required to fill out witness cards, which must be submitted to MPO Staff no later than 15 minutes after the start of the meeting. Speakers shall identify themselves at the microphone. Comments are limited to three (3) minutes per speaker. No more than three (3) persons will be allowed to speak on any side of an issue. Should there be more than three (3) people who wish to speak on a specific issue, they should select not more than three (3) representatives to speak on their behalf. The presiding officer may further limit public on the interest of order or time. Speakers may not transfer their minutes to any other speaker. Comments should be relevant to City business and delivered in a professional manner. No derogatory remarks shall be permitted.
Approval ofthe minutes for the meeting held on August 19th, 2019, September 16t11, 2019, and September 24th, 2019.
Receive public testimony and approving Resolution No. MPO 2019-06 adopting the proposed amendment(s) ofthe 2019-2022 Transportation Improvement Program (TIP): l. Addition of project CSJ 0018-06- I 84 for the construction of interchange direct connector 8, on IH 35, from 0.50 miles south of US 59 to 0.50 miles east ofiH 35, with estimated total project cost of25,755,400, intended to let in FY 2020. 2. Revision of project CSJ 00 I 8-06- I 83 for the construction of interchange direct connector 5, located from 0.50 miles south of US 59 to 0.50 miles east ofiH 35. Purpose of amendment is to revise the estimated letting date from fiscal year (FY) 2019 to FY 2020. 3. Revision of project CSJ 0018-06-136 for the widening of main lanes and the construction of a railroad grade separation, from Shiloh Drive to 0.25 miles north of US 59/IH 69W. Purpose of amendment is to revise the estimated letting date from fiscal year (FY) 2021 to FY 2020.
Receive public testimony and approve Resolution No. MPO 2019-07 adopting the following proposed amendment(s) of the 2015-2040 Metropolitan Transportation Plan (MTP): 1. Amending Table 12-10, entitled Roadway and Bicycle/Pedestrian Project Summary, Figure 12-1, entitled Roadway and Bicycle/Pedestrian Projects, Table 12-11, entitled Roadway Projects, Figure 13-1, entitled Natural Resources and Federally Funded Projects, Figure 13-2, entitled Cultural Resources and Federally Funded Projects, Figure 13-3, entitled Low Income Areas and Federally Funded Projects, Table 13-1, entitled Federally Funded Projects Environmental Assessment Results, Table 13-3, entitled Federally Funded Projects and Environmental Justice Populations; and, Figure 13-4 entitled Colonias and Federally Funded Projects as necessary to incorporate the following revision(s): a) Addition of project CSJ 0018-06-184 for the construction of interchange direct connector 8, on IH 35 located from 0.50 miles south of US 59 to 0.50 miles east ofiH 35, with estimated total project cost of25,755,400, intended to let in FY 2020. b) Revision of project CSJ 0018-06-183 for the construction of interchange direct connector 5, located from 0.50 miles south of US 59 to 0.50 miles east of IH 35. Purpose of amendment is to revise the estimated letting date from fiscal year (FY) 2019 to FY 2020. c) Revision of project CSJ 0018-06-136 for the widening ofmain lanes and the construction of a railroad grade separation, from Shiloh Drive to 0.25 miles north of US 59/IH 69W. Purpose of amendment is to revise the estimated letting date from fiscal year (FY) 2021 to FY 2020. 2. Revision of Chapter 1, perFAST Act requirements to include additional planning factors; and, (Ref: 23 CFR 450.206(a)(9&10) and 306(b)(9&10)) and include Safety, Bridge, Pavement/ Roadway and Transit System Performance targets; and, (Ref: 23 CFR 450.324(f)(3)). 3. Revision of Chapter 12 to update the project evaluation criteria to support the selection of projects in accordance with the adopted perfonnance measures and targets. 4. Addition of Appendix 1, entitled Documentation Adoption of Federally Required Performance Measures/Targets and System Evaluation Report.
Receive public testimony and initiate a twenty-day public review and comment period for draft 2020-2045 Metropolitan Transportation Plan (MTP).
Appointment of Councilmember George Altgelt as the Laredo Mass Transit Board representative for the MPO.
*A portion of this clip is without video* Discussion with possible action on Cuatro Vientos Rd.
*A portion of this clip is without video* Discussion with possible action on future reconfiguration ofiH-35 serving the Mall del Norte.
Presentation on Debt and Strategic Contracts Division on State Infrastructure Bank (SIB) Transport Loan Program.
VI. DIRECTOR'S REPORT A. Review purpose and process ofMPO Technical Committee and MPO Policy Committee. VII. ADJOURNMENT
I. CHAIRPERSON TO CALL MEETING TO ORDER II. CHAIRPERSON TO CALL ROLL III. CITIZEN COMMENTS Speakers are required to fill out witness cards, which must be submitted to MPO Staff no later than 15 minutes after the start of the meeting. Speakers shall identify themselves at the microphone. Comments are limited to three (3) minutes per speaker. No more than three (3) persons will be allowed to speak on any side of an issue. Should there be more than three (3) people who wish to speak on a specific issue, they should select not more than three (3) representatives to speak on their behalf. The presiding officer may further limit public on the interest of order or time. Speakers may not transfer their minutes to any other speaker. Comments should be relevant to City business and delivered in a professional manner. No derogatory remarks shall be permitted.
Approval ofthe minutes for the meeting held on August 19th, 2019, September 16t11, 2019, and September 24th, 2019.
Receive public testimony and approving Resolution No. MPO 2019-06 adopting the proposed amendment(s) ofthe 2019-2022 Transportation Improvement Program (TIP): l. Addition of project CSJ 0018-06- I 84 for the construction of interchange direct connector 8, on IH 35, from 0.50 miles south of US 59 to 0.50 miles east ofiH 35, with estimated total project cost of25,755,400, intended to let in FY 2020. 2. Revision of project CSJ 00 I 8-06- I 83 for the construction of interchange direct connector 5, located from 0.50 miles south of US 59 to 0.50 miles east ofiH 35. Purpose of amendment is to revise the estimated letting date from fiscal year (FY) 2019 to FY 2020. 3. Revision of project CSJ 0018-06-136 for the widening of main lanes and the construction of a railroad grade separation, from Shiloh Drive to 0.25 miles north of US 59/IH 69W. Purpose of amendment is to revise the estimated letting date from fiscal year (FY) 2021 to FY 2020.
Receive public testimony and approve Resolution No. MPO 2019-07 adopting the following proposed amendment(s) of the 2015-2040 Metropolitan Transportation Plan (MTP): 1. Amending Table 12-10, entitled Roadway and Bicycle/Pedestrian Project Summary, Figure 12-1, entitled Roadway and Bicycle/Pedestrian Projects, Table 12-11, entitled Roadway Projects, Figure 13-1, entitled Natural Resources and Federally Funded Projects, Figure 13-2, entitled Cultural Resources and Federally Funded Projects, Figure 13-3, entitled Low Income Areas and Federally Funded Projects, Table 13-1, entitled Federally Funded Projects Environmental Assessment Results, Table 13-3, entitled Federally Funded Projects and Environmental Justice Populations; and, Figure 13-4 entitled Colonias and Federally Funded Projects as necessary to incorporate the following revision(s): a) Addition of project CSJ 0018-06-184 for the construction of interchange direct connector 8, on IH 35 located from 0.50 miles south of US 59 to 0.50 miles east ofiH 35, with estimated total project cost of25,755,400, intended to let in FY 2020. b) Revision of project CSJ 0018-06-183 for the construction of interchange direct connector 5, located from 0.50 miles south of US 59 to 0.50 miles east of IH 35. Purpose of amendment is to revise the estimated letting date from fiscal year (FY) 2019 to FY 2020. c) Revision of project CSJ 0018-06-136 for the widening ofmain lanes and the construction of a railroad grade separation, from Shiloh Drive to 0.25 miles north of US 59/IH 69W. Purpose of amendment is to revise the estimated letting date from fiscal year (FY) 2021 to FY 2020. 2. Revision of Chapter 1, perFAST Act requirements to include additional planning factors; and, (Ref: 23 CFR 450.206(a)(9&10) and 306(b)(9&10)) and include Safety, Bridge, Pavement/ Roadway and Transit System Performance targets; and, (Ref: 23 CFR 450.324(f)(3)). 3. Revision of Chapter 12 to update the project evaluation criteria to support the selection of projects in accordance with the adopted perfonnance measures and targets. 4. Addition of Appendix 1, entitled Documentation Adoption of Federally Required Performance Measures/Targets and System Evaluation Report.
Receive public testimony and initiate a twenty-day public review and comment period for draft 2020-2045 Metropolitan Transportation Plan (MTP).
Appointment of Councilmember George Altgelt as the Laredo Mass Transit Board representative for the MPO.
*A portion of this clip is without video* Discussion with possible action on Cuatro Vientos Rd.
*A portion of this clip is without video* Discussion with possible action on future reconfiguration ofiH-35 serving the Mall del Norte.
Presentation on Debt and Strategic Contracts Division on State Infrastructure Bank (SIB) Transport Loan Program.
VI. DIRECTOR'S REPORT A. Review purpose and process ofMPO Technical Committee and MPO Policy Committee. VII. ADJOURNMENT